Deconstruction of a belt walkway (total length 103 m): the belt walkway was deconstructed into 3 parts by means of oxypropane torches: each cut element was removed using 2 cranes (max. element weight 67 T) and positioned on the ground for subsequent demolition with an excavator equipped with hydraulic shears.
Deconstruction of a chimney stack, at the service of Lepold electrofilters (H = 86 m): the chimney was cut into 14 parts using electrical equipment equipped with diamond-dressed wire placed on electric self-climbing scaffolding; each cut element was removed by means of a 500 T crane (element weight 42 T) and placed on the ground for subsequent demolition with an excavator equipped with a hydraulic crusher.
Deconstruction of a port crane (H=50 m) by means of hot cutting using oxypropane torches.
Each cut element was removed with a crane and positioned on the ground for subsequent demolition with an excavator equipped with hydraulic shears.
Controlled demolition of the 45 m high C2-C5 building using a super-long PMI 150 track-mounted excavator.
The super-long version is a 230 T track-mounted excavator equipped with a 64 m arm.
Deconstruction of a 5.5 m diameter rotary furnace with refractory inner cladding. The furnace was emptied and then deconstructed by means of oxypropane torches: each cut element was removed with a crane and positioned on the ground for subsequent demolition with an excavator equipped with hydraulic shears.
Deconstruction of no. 4 silos (H=30 m).
Part of the silos was hot-deconstructed using oxypropane torches and the rest was demolished with an excavator equipped with hydraulic shears.
Controlled demolition by means of a Kobelco SK550d excavator equipped with hydraulic shears.
The building (H=30 m) was demolished in complete safety, paying particular attention to a production facility located adjacent to the work site.
Controlled demolition by means of a PMI150 super-long excavator of plant systems and sections of the synthetic granular production building and the above-ground tank systems (H=45 m).
Deconstruction of plant systems using a mobile crane.
Deconstruction of a pair of electrofilters on a blank baking line
To start with the dust was removed from the filtration system and then deconstructed using oxypropane torches into several parts: each electrofilter, weighing 160 tons, was removed using no. 2 x 500 T cranes and placed on conveyor carriages, They were then positioned on the ground in a dedicated area for pending reclamation of asbestos fibres and artificial vitreous fibre and the final demolition with an excavator equipped with hydraulic shears.
Demolition controlled by means of a super-long PMI150 excavator and a PMI975 excavator of no. 3 x 50,000 cbm metal tanks above the ground (H=22 m and 86 m) and decommissioning of related technological installations.