Decommissioning old-generation nuclear power plants is by no means easy; the safety of the operators and the surrounding environment are at stake, not to mention the deconstruction of massive, oversized buildings. The operational project has therefore been developed, not only as regards to the structural aspect, but also the technologies (including robotics) custom-designed for these kinds of operations.
The 200 T rotor removed from the decommissioned nuclear power plant was literally untransportable, and impossible to cut using traditional methods. Longhi has creatively adapted techniques, generally used for other materials, so they can be used for steel; in just 6 days it reduced the giant rotor into 7 x 28.5 T pieces which could be transported by standard HGV.