Reclamation of insulation containing flaky asbestos fibres on the inside and upper part of the casing of the “TOSI – C.E. VU 60” boiler.
Reclamation by removal of cladding and side panelling containing compacted asbestos fibres from the “Raw Material Storage” warehouse, as part of the Revamping works and the installation of new sandwich panels.
BoReclamation by means of the removal of shredded fabric containing compact asbestos present on the metal spacers of the cladding of ducts and Lepold electrofilters as part of the deconstruction work on the decommissioned baking line no. 4.
Reclamation by removal of flaky asbestos fibres and artificial vitreous fibre used as plant system insulation (no. 3 boilers, 1 turbogas, 2 turboalternators, electrofilter) and relative Heavy Fuel Oil supply lines c/o former Thermoelectric power plant.